v2 working dashboard

Verification status

89 v2 map cases · built Oct 3, 2026 · staged data, not yet released

Map cases: base locations and unit counts

Each v2 case is one UN deployment map that the 2026 update coded and that no person had coded before. A case climbs four stages as independent readings are adjudicated into the data. A reading that is finished but not yet adjudicated shows as a dashed pip and does not count.

What each stage means

single-LLM
One full model reading of the map is in the data.
double-LLM
A second, independent full model reading was compared with the first, and the disagreements were adjudicated into the data.
single-human
A research assistant coded the map blind, and the disagreements with the model reading were adjudicated into the data.
double-human
Two research assistants coded the map independently, and their readings were reconciled into the data.

Re-counts of only the multi-unit claims are partial checks, so they never move a case up a stage. Practice maps never count.

How good is one model reading?

The same scorer the research assistants face, run on model readings of three months that people coded before 2026. Agreement counts every base and country pair in either the answer key or the reading, so extra pairs count against it. Strict counts the answer key's pairs read with the exact unit count.

MapReaderStrictAgreementNote
UNMISS Feb 2020Claude Sonnet52 of 52 (100%)52 of 52 (100%)used to build the rules
MONUSCO Feb 2019Claude Sonnet57 of 61 (93%)55 of 60 (92%)used to build the rules
MONUSCO Jun 2019Claude Sonnet with an Opus re-count of multi-unit claims23 of 57 (40%)24 of 75 (32%)not used to build the rules; key still being checked

February 2020 and February 2019 were used to develop the coding rules, so they flatter the method. The June 2019 answer key is still being checked against its map, so treat that row as provisional.

Model record

Exact model versions were not stamped when these maps were coded, and the session records from that period are not on this machine. Each batch below shows the model family the project log names, or "not recorded" where it names none. From now on, every new model reading records its exact model version, date and source document.

ReadScopeMaps coveredModelGenerationDatesIn the data
Base presence readfullMINUSCA Jun 2020 to Jun 2024 (12 maps); MINUSMA Mar 2020 to Jun 2023 (15 maps); MONUSCO Feb 2020 to Feb 2022 (9 maps); UNMISS Jun 2020 to Oct 2024 (13 maps)not recordednot recordedJun 1 to 3, 2026yes
Unit count readfullMINUSCA Jun 2020 to Jun 2024 (12 maps); MINUSMA Mar 2020 to Jun 2023 (15 maps); UNMISS Jun 2020 to Oct 2024 (13 maps)Claude Sonnetnot recordedJun 10, 2026yes
Unit count readfullMONUSCO Feb 2020 to Feb 2022 (9 maps)Claude Sonnetnot recordedJun 14, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)MONUSCO Feb 2020 to Feb 2022 (9 maps)Claude Opusnot recordedJun 14, 2026yes
Unit count readfull (coded from scratch)MONUSCO Jun 2022 to Sep 2025 (14 maps)Claude Sonnetnot recordedJun 14, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)MONUSCO Jun 2022 to Sep 2025 (14 maps)Claude Opusnot recordedJun 14 to 15, 2026yes
Unit count readfull (coded from scratch)MINUSCA Oct 2024 to Oct 2025 (4 maps); UNMISS Jan 2025 to Jul 2025 (4 maps)Claude Sonnetnot recordedJun 14, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)MINUSCA Oct 2024 to Feb 2025 (2 maps); UNMISS Jan 2025 to Jul 2025 (4 maps)Claude Opusnot recordedJun 15, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)MINUSCA Jun 2025 to Oct 2025 (2 maps)not recordednot recordedJun 15, 2026yes
Unit count readfull (coded from scratch)UNISFA Oct 2018 to Sep 2025 (15 maps)Claude Sonnetnot recordedJun 16, 2026yes
Unit count readfull (coded from scratch)UNISFA Feb 2020 to May 2023 (3 maps)Claude Opusnot recordedJun 20, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)UNISFA Feb 2020 to Feb 2023 (6 maps)Claude Opusnot recordedJun 20, 2026yes
Re-count of multi-unit claimspartial (claims with 2 or more units)UNISFA Apr 2020 to Sep 2025 (9 maps)not recordednot recordedJun 21, 2026yes
Full blind re-readfullUNISFA Oct 2018 to Sep 2019 (3 maps)Claude Sonnet and Claude Opus (Oct 2018); Claude Opus (Apr 2019); Claude Sonnet (Sep 2019)not recordedJul 2, 2026adjudicated, not yet applied

Troop counts: the counts layer

Parser-extracted, not model-read

YearStatusUN report formatWhat it meansScale
1999Not yet checkedScanned image PDFImage-only scans (no text layer). Not yet validated: needs OCR / Vision.2 mission-months, 1 with no source report
2000Not yet checkedScanned image PDFImage-only scans (no text layer). Not yet validated: needs OCR / Vision.22 mission-months, 2 with no source report
2001Checked against sourceCross-tab / scannedMay-Dec source-validated Jun 9 (batch 11): 29/29 disputed cells render-verified parser-right; v1 page-skip + uruguay-into-ukraine blend fixed. Jan-Apr are scanned images (OCR bucket, pending scope decision).22 mission-months, 43 rows corrected, 2 with no source report
2002Checked against sourceCross-tab (2 variants)Source-validated Jun 9 via two new cross-tab parsers (rotated + transposed). All 7 v1-diff flags source-verified from rendered pages; 425+ cells agree with v1 exactly.14 mission-months, 7 rows corrected, 10 with no source report
2003Checked against source"Members" single-colSource-validated Jun 9 via the 2003 Members parser: 100% printed-total checksums, all 6 on-disk months. 51 corrections incl. v1's mis-coded may-2003 MONUC (China engineer contingent: 188 troops, v1 had 1).12 mission-months, 44 rows corrected, 13 with no source report
2004Checked against source"Members" single-colSource-validated. Parser certified vs Vision; v1 errors corrected.47 mission-months, 82 rows corrected, 5 with no source report
2005Checked against source"Members" single-colSource-validated incl. the 8 UNOCI months recovered this spring via the ONUCI alias (the UN labeled the mission ONUCI before late 2006).69 mission-months, 199 rows corrected
2006Checked against source"Members" single-colSource-validated incl. the 7 UNOCI months (ONUCI alias) and dec-2006 country-major (4 missions) recovered this spring.59 mission-months, 103 rows corrected
2007Checked against source"Members" single-colSource-validated.52 mission-months, 153 rows corrected
2008Checked against sourceBy-missionSource-validated (all months).69 mission-months, 72 rows corrected
2009Checked against sourceBy-country (mission-major)Source-validated. The 2 country-major months (Jan, Jul) were rebuilt clean this spring with a new parser (100% subtotal reconcile; 99 v1 errors corrected).72 mission-months, 189 rows corrected
2010Checked against sourceM / F columnsSource-validated. The apparent 2010 fails were triaged: 9 spurious pre-2014 MINUSCA entries + the MONUC→MONUSCO rename month (v1 correct as-is).81 mission-months, 289 rows corrected
2011Checked against sourceM / F columnsSource-validated.61 mission-months, 112 rows corrected
2012Checked against sourceM / F columnsSource-validated. Feb-2012 (the lone country-major M/F month) fully rebuilt: MONUSCO (batch 8) + the other 5 missions (batch 9, Jun 9). 2010-15 bucket closed.72 mission-months, 94 rows corrected
2013Checked against sourceM / F columnsSource-validated.78 mission-months, 116 rows corrected
2014Checked against sourceM / F columnsSource-validated.80 mission-months, 141 rows corrected, 6 with no source report
2015Checked against sourceM / F columnsSource-validated.84 mission-months, 191 rows corrected
2016Checked against sourceTotal-For-CountrySource-validated, including the late-2016 months rebuilt clean this spring (FPU bug fixed).84 mission-months, 192 rows corrected
2017Checked against sourceTotal-For-CountrySource-validated, including the rebuilt Total-For-Country months and jul-2017 country-major M/F (recovered this spring).77 mission-months, 263 rows corrected, 7 with no source report
2018Checked against sourceTotal-For-CountrySource-validated: all of the previously-blank 2018 months were recovered + rebuilt clean this spring.72 mission-months, 35 rows corrected
2019New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged. The temporal refresh.63 mission-months, 6 with no source report
2020New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged.60 mission-months
2021New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged.60 mission-months
2022New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged. (Jul-2022 is a real missing UN report.)40 mission-months, 15 with no source report
2023New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged.0 mission-months, 60 with no source report
2024New extension dataExtension (MSR)New data: built + cross-checked (referee2), staged. (MINUSMA closed Dec-2024.)0 mission-months, 59 with no source report
2025New extension dataExtension (MSR)NEW data through Sep-2025: built + cross-checked (referee2), staged.0 mission-months, 36 with no source report